
























|

|



|

An environment monitoring plan has been mapped
out in cooperation with the governor of Osaka and the
mayors of the 9 cities and 4 towns of the area in order to grasp the
influence of the work of phase 2 onto the environment, to prevent
deterioration of the environment by taking suitable measures as required,
and to check for problems in regard to environment protection by comparison
with environment protection targets.
This plan is used as the basis
for environment monitoring.

Environment monitoring items for existence and operation of the airport (2010.8-)

Main investigation items
|
Number of investigation points
|
Investigation frequency
|
Noise
|
Aircraft noise |
regular
observation:
11 points |
Continuous
measuring |
periodic
fixedpoint
observation:
about
10 points
|
1 times/year |
| Water quality |
Transparency, water temperature, salt content, pH, DO, COD, T-N, T-P, Chlorophyll-a, SS
|
Inner Sea:3 points
|
2 times/year
|
Sediment
|
Sludge temperature, Ignition loss, Grain composition, pH, COD, T-N, T-P, sulfides
|
Inner sea area:3 points
|
2 times/year
|
Marine life
|
bottom organisms |
Inner sea area:3 points
|
2 times/year |
Atmosphere
|
Nitrogen oxides (nitrogen monoxide, nitrogen dioxide), SPM, photochemical oxidants, hydrocarbons (methane, non-methane), Wind direction/speed
|
1 points
|
Continuous measuring
|
Environment monitoring items during the construction
work (1999.6-2007.8)
Environment monitoring items for the existence
and operation of the airport (2007.8-)

|

|

|